- Client
- National Iranian Steel Company
- Project Product
- 800,000 t/y Steel Billet
- Barsoo Scope of Work
- Bidding Consultant
- Designing of Auxilliary Buildings
- Design Review
- Project Master Consultant
- Start Date
- May 2007
- Finish Date (Actual or Planed)
- Apr. 2011
- Participants
- Consortium of IOEC, IRITEC & IRASCO (EPC Contractor of Direct Reduction Plant)
- Consortium of IRITEC & IRASCO (EPC Contractor of Steel Making Plant)
- Key Person of the Project
- Farzad Farrokhnia (Project Manager)
- Majid Asgari (Project Coordinator)
- Ramtin Jamali (Project Engineer)
- Hassan Sadeghi (Project Planner)
- Project Progress
- 17.82%
- Cutoff Date
- 8 Feb. 2009
- Project Description
- This project consists of one Direct reduction module and on steel Making Plant including all utilities and infrastructure for producing of 800,000 T/A billet and bloom.
- Scope of services:
- Preparation of Tender Documents for Steel Plant
- Basic and Detail design of infrastructures and buildings
- Design water Networks
- Design of sewage system
- Basic and Detail Design of Shunting Yard inside the complex
- Endorsement of documents and drawings to be provided by contractors
- Project overall supervision
- Site Supervision Services
- Planning and project control
- Inspection and supplier's workshops supervision