- Client
- NISCO
- Project Product
- Billet (800.000 ton/year)
- Barsoo Scope of Work
-
- Bidding Consultant
- Designing of Auxilliary Buildings
- Design Review
- Project Master Consultant
- Start Date
- 15 Feb. 2008
- Finish Date (Actual or Planed)
- Feb. 2012
- Participants
- Consortium of: Khatam-al-Anbia, MME, Foolad Paya as EPC contractor of Direct Reduction Plant
- Key Person of the Project
- Farzad Farrokhnia (Project Manager)
- Atarod Goudarzi (Project Coordinator)
- Keyvan Bahrami (Project Engineer)
- Aydin Ketabchi (Project Planner)
- Project Progress
- 9.37%
- Cutoff Date
- 18 Feb. 2009
- Project Description
-
- Scope of services:
- Preparation of Tender Documents for Steel Plant
- Basic and Detail design of infrastructures and buildings
- Design water Networks
- Basic and Detail Design of Shunting Yard inside the complex
- Endorsement of documents and drawings to be provided by contractors
- Project overall supervision
- Site Supervision Services
- Planning and project control
- Inspection and supplier's workshops supervision
This project consists of one Direct Reduction Module and on Steel Making Plant including all utilities and infrastructure for producing of 800,000 T/A billet and bloom.