Client
NISCO
Project Product
Billet (800.000 ton/year)
Barsoo Scope of Work
  • Bidding Consultant
  • Designing of Auxilliary Buildings
  • Design Review
  • Project Master Consultant
Start Date
15 Feb. 2008
Finish Date (Actual or Planed)
Feb. 2012
Participants
Consortium of: Khatam-al-Anbia, MME, Foolad Paya as EPC contractor of Direct Reduction Plant
Key Person of the Project
  • Farzad Farrokhnia (Project Manager)
  • Atarod Goudarzi (Project Coordinator)
  • Keyvan Bahrami (Project Engineer)
  • Aydin Ketabchi (Project Planner)
Project Progress
9.37%
Cutoff Date
18 Feb. 2009
Project Description

    This project consists of one Direct Reduction Module and on Steel Making Plant including all utilities and infrastructure for producing of 800,000 T/A billet and bloom.

  • Scope of services:
  • Preparation of Tender Documents for Steel Plant
  • Basic and Detail design of infrastructures and buildings
  • Design water Networks
  • Basic and Detail Design of Shunting Yard inside the complex
  • Endorsement of documents and drawings to be provided by contractors
  • Project overall supervision
  • Site Supervision Services
  • Planning and project control
  • Inspection and supplier's workshops supervision